Location:HOME > Product > Pipe fittings > caps > Pictures >

Stainless Steel End Cap Brand

steel cap
Size: From 1/2" to 48" (Seamless pipe fittings).
From 26" to 72" (Seam pipe fittings)
Material Carbon steel,Alloy steel,Stanless steel,Low-temperature steel,High performance
Name: Stainless Steel End Cap Brand
Standards: ASME B16.9-2007, EN10253-1-1999, DIN2605-1-1992,JIS B2311-2009 JIS B2312-2009 
Certificate: API Q1-1958,ISO9001:2008,TUV,SGS,CCS,ETC
 

  Stainless Steel End Cap is also called the plug or head.Purpose: welding on the pipe end or installed outside the pipe thread to cover wall pipe fittings.Close to line, the same as the plug.

  Pipe cap including convex cap, conical shell, variable diameter section, the design of the flat cover and tighten.

  Convex tube caps include: hemispherical tube cap, oval tube caps, disc pipe cap cap.From the standpoint of stress, convex cap in the gradually from hemispherical tube cap is not good, but look from the manufacturing difficulty, good manufacture gradually.

  304 l stainless steel: 304 316 316 l, 321, 2520, 310, 316, such as material.

  Size: DN15-48 ")

  Wall thickness: SCH5 - SCH160

  Standard: ASME DIN JIS BS GB/T, JB SH HG

  USES: water, beverages, beer, food, petrochemical, nuclear power, chemical fertilizer, shipbuilding, machinery, medical equipment, waterproof processing, pipeline, etc

  Packing: packed in wooden cases, cartons service: provide technical advice, installation guide, etc

  Disc cap r, avoid joining together, will be thinned and high stress.

  Splice weld direction when asked to only allow is radial and ring.After large cap may cancel this request.Stitching distance requirements, for more than 3 g, and not less than 100 mm (welding heat affected zone is high stress zone, and in the chemical composition of the area will be a loss. So to avoid the high stress area, the area and thickness. According to the practical experience, the stress attenuation length is greater than 3 g, and not less than 100 mm).But refrigeration equipment is difficult to meet the requirements, has its particularity.

  Thebutt welds joining together after forming the head, should be 100% rays or ultrasonic testing, the qualified level with the equipment shell.Finally forming the same welding seam detection level, scale and equipment shell, high waste.

  Example: if the shell is 20% testing equipment, qualified III.The straight stitching and final weld, III qualify, welded joint coefficient is 0.85;

  So straight stitching, although 100% inspection, qualified level, along with the housing.

  But must pay attention to the process manufacturing process:

  The correct way is: blanking (line) - small plate together into a big board - molding - nondestructive testing

  If it's wrong to do testing before molding, can't guarantee is qualified after forming.That is nondestructive testing refers to the nondestructive testing.